Post-Construction Cleanup — Rough, Final, Punch-List

Tenant improvements, new-build interiors, renovation turnover. Rough clean, final clean, and punch-list support crews — so the space is move-in ready the day your client walks through.

Ideal for: General contractors, tenant improvement projects, new-construction handovers, commercial renovations, property owners prepping a space for move-in or lease.

Get a Quote · Call (323) 264-7800

Three Phases of Post-Construction

Most projects need all three, scheduled around your trades.

What's Different About Post-Construction

Drywall dust is everywhere. Adhesive residue on floors. Paint overspray on glass. Labels on fixtures and windows. Concrete slurry in drains. Our post-con crews carry specialty chemistry for each — drywall dust HEPA vacuuming, adhesive solvents for tile, label and sticker removers for glass, concrete etch for stubborn slurry.

Coordination With Your GC

We coordinate with your superintendent on trade sequencing, access windows, and punch-list handoffs. We can typically scale from one crew to 20+ technicians for large final cleans on a tight deadline.

Pricing

Post-construction is priced by square footage and scope (rough / final / punch). Quote turnaround: 24-48 hours after walkthrough or plan review. Rush rates available for tight deadlines.

Frequently Asked Questions

How fast can you mobilize a post-con crew?

For most LA and OC projects, 48-72 hours. For emergencies, we've mobilized same-day with partial crew.

Can you handle large finals on tight deadlines?

Yes — we've run 20+ technician final cleans on 100,000 sq ft projects over a single weekend. Scale depends on the tradespeople still on site.

Do you handle label removal and adhesive residue?

Yes — specialty solvents for sticker, label, and adhesive removal on glass and fixtures. Part of standard final clean.

Will you coordinate with our superintendent?

Yes — that's how we work. Our supervisor walks the site with your super and aligns on sequencing and access.

Related services